Where is the documentation of all considered site options with pros and cons for each site?

Preliminary Basin Locations identifies potential areas. From these areas, Markgrafs, Hudson/Woodbury NE, and Commerce where identified as the most suitable locations. The locations considered were based on criteria related to maintenance, ability to get water to the locations, design requirements and available area.

Show All Answers

1. What are the legal contractual considerations altering existing green spaces and Markgrafs Lake?
2. Where is the documentation of all considered site options with pros and cons for each site?
3. Where are the actual plans for biofiltration basin site indicating size, depth and cross sections?
4. What types of plants are proposed for the basin?
5. What is the existing and proposed ground cover?
6. There are concerns of disrupting a turtle nesting area.
7. What are the plans for scheduled site maintenance and budgetary support?
8. What are the considerations for the loss of green space by the addition of the biofiltration basin which affects the unstructured recreational use for all citizens of Woodbury to walk, bike and frol
9. What is the project record?