County Road 65 (Oakgreen Avenue)
During construction, Washington County will send out updates on construction activity. The update will provide information on work that happened throughout the project and an update on the schedule. In addition, when applicable, there will be photos, maps, and other information so that residents and business owners can stay informed on the progress.
If you would like to get these updates via email when they are available, sign up by clicking on the button below. All updates will also be posted on this page.
2023 Construction Updates
Washington County lead a study to develop a preliminary design concept for Oakgreen Avenue (County Road 65). The study identified road improvements such as turn lanes, resurfacing, storm water management, safety improvements, and pedestrian and bicyclist considerations.
Location
- County Road 65 (Oakgreen Avenue) from County Highway 10 (10th Street) to County Highway 14 (40th Street) in the West Lakeland and Baytown Townships.
Project Goals
- Improve quality and life of the pavement
- Maintain wide shoulder to accommodate pedestrians and bicyclists
- Improve drainage along the corridor
- Add turning lanes at key intersections
Pre-Construction Open House (March 8, 2023)
An online engagement was also available to view the materials that were shown at the in-person open house and provide feedback.
Open House #3 (January 26, 2022)
Open House #3 Invitation (PDF)
An online engagement was also available to view the materials that were shown at the in-person open house and provide feedback.
Open House #2 (December 6, 2018)
Open House #2 Invitation (PDF)
Information from the Open House:
- Display Boards (PDF)
- Comment Form (PDF)
- One Pager (PDF)
- Crash Data (PDF)
- CR 65 Layout (PDF)
- CSAH 10 Layout (PDF)
- CSAH 14 Layout (PDF)
- Open House Summary (PDF)
Open House #1 (July 10, 2018)
Open House #1 Invitation (PDF)
Information from the Open House:
DATE | ACTIVITY |
---|---|
April 2018 - January 2019 | Preliminary Design and Public Engagement |
2022 | Final Design and Right-of-Way Acquisitions |
2023 | Construction |
-
Andrew Giesen
Design EngineerPhone: 651-430-4336
-
Mindy Leadholm
Right of Way SpecialistPhone: 651-430-4361