Right of Way Permit

Right of Way Permits are Required For

  • Utility Installations (including private sewer and water connections)
  • Grading in County right of way
  • Work which obstructs the right of way
  • All utility companies performing maintenance on their facility
  • Host a parade, race, or event

Please allow two weeks for processing.

Click the links below:

Right of Way Permit Fees
Utility Service Lateral$25
Annual Maintenance$100
All Others$100 per 1/8 mile or fraction there of

In addition to the applicable fees, a REFUNDABLE deposit (amount is determined on a case-by-case basis) or bond may be required.